All insights

Landlords & Tenants · Tenancy Clauses

Who Pays for Repairs in a Tenancy: The Minor Repair Clause

By Winfred Quek · 8 minute read · Published 26 October 2026

By Winfred Quek · CEA R073319H · Published 26 October 2026

Quick answer: The official CEA tenancy agreement templates, for both private homes and HDB flats, put minor repairs on the tenant up to a dollar amount per item per incident, and the landlord pays above it. The amount is left blank, so the two of you must fill it in, and I found no official figure to quote. A problem free period at the start protects the tenant from early defects, and structural items stay with the landlord. Read the clause before you sign, because it sets who pays for the next dripping tap. General information only.

Facts verified: 26 October 2026 · Sources listed below

Repair arguments rarely start with a big failure. They start with a $60 call out for a faulty shower mixer, and one side believes the other should pay. The minor repair clause exists to settle that in advance. My tenancy agreement clauses guide lists it as one of several clauses. This page goes deeper on the repairs themselves: how the official templates split the cost, which pieces of the clause matter, and how to run it day to day. Condo common property is a different question, covered in common property versus your unit.

What the official templates say

CEA publishes tenancy agreement templates for private residential property and for HDB flats, developed by the Digitalised Property Transactions Workgroup. CEA describes them as a guide, not compulsory, and says you are free to negotiate any term. I read both templates on 26 October 2026. They share the same repair structure, summarised here.

PieceWhat the template says
Minor repair itemTenant pays all minor repairs so long as the cost per item per incident does not exceed an amount left blank. Above it, the tenant pays that amount and the landlord pays the balance.
Problem free periodA number of days, left blank, from the first day of the tenancy. Within it, the landlord does not hold the tenant responsible for defects the tenant identifies and reports in writing, and the landlord rectifies them.
After that periodTenant is responsible for minor repairs and replacement of parts and other expendable items, including electrical appliances and light bulbs, within the amount. Excess is borne by the landlord unless the damage is due to the tenant's negligence or wilful default.
Above the amountThe tenant needs the landlord's prior written consent to proceed, and the landlord reimburses the excess within seven days.
Beyond repairThe landlord bears the full cost of replacing the item, if the fault is not due to the tenant's negligence or wilful default.
Air conditionersTenant arranges servicing by a qualified contractor at least once every three months at its own cost. The landlord handles breakdowns, repairs, replacement of parts and chemical cleaning, unless the breakdown is due to the tenant's negligence or non maintenance.
StructureLandlord keeps the structural condition in repair, including sanitary pipes, electric wiring and concealed drains, pipes and conduits.
Self helpThe tenant may not authorise repairs without written consent. If the tenant starts works the landlord is obliged to do, without giving the landlord a chance first, the tenant cannot recover the cost.
No fault foundIf the landlord's contractor attends and finds no fault, or the fault is the tenant's or visitors', the tenant bears the contractor's charge out rate.

Source: CEA, Tenancy Agreement Template for Private Residential Property and Tenancy Agreement Template for HDB Flats, linked from cea.gov.sg renting a private residential property and cea.gov.sg renting out an HDB flat or bedroom, checked 26 October 2026.

The blank amount, and why I do not quote one

The template does not say how much is a minor repair. It leaves the dollar cap blank, and it leaves the problem free period blank too. I found no CEA, HDB or URA figure for either, so I will not state a number as if it were standard. What you see in practice varies between agents, landlords and properties, and it should reflect the age of the unit, who owns the appliances and how willing each side is to handle small jobs. What matters is that the number is written in, because a blank leaves the argument open.

Illustration with an assumed cap

This uses a deliberately round assumed cap of $100 per item per incident, chosen only to make the arithmetic easy. It is not a market norm and not an official figure. The repair bills are also assumed.

Case (assumed)CostUnder the template structure
Replacing a light fitting driver, after the problem free period$70Tenant pays $70, within the cap
A washing machine pump, not caused by misuse$250Tenant pays $100, landlord pays $150, and the tenant needs the landlord's prior written consent before the work
A fridge that is beyond repair, not the tenant's faultNew unitLandlord bears the full replacement cost
The same pump fault reported in week 2, inside an assumed problem free period$250Landlord rectifies it, if the tenant reported it in writing
A leak from a concealed pipe in the wallVariesStructural item, landlord keeps it in repair

Notice the cap is per item and per incident, so two faults on two days are two incidents, and one fault that keeps recurring may be one item with several incidents. That is the sort of detail you can settle in the clause rather than in a dispute.

Variations you will see in practice

These are drafting habits, not official positions. Agree on them in writing if you want them.

How to run the clause day to day

  1. Document the starting condition. The private template has the tenant prepare two copies of a Property Condition Report within the problem free period for the landlord's endorsement, and describes it as conclusive evidence of the condition at the start. Dated photos support it.
  2. Report faults in writing. A message is enough, as long as it is dated. It starts the clock and shows the problem was raised inside the free period.
  3. Get consent for anything above the cap. Written, before the work. Keep the quote.
  4. Keep receipts. Both for what the tenant paid and for the landlord's reimbursement.
  5. Arrange air conditioner servicing and keep the receipts. The template asks for proof of regular servicing, and a breakdown linked to non maintenance shifts the cost to the tenant.

What the clause does not decide

It does not decide common property repairs in a condo, which follow the development's by laws and the management corporation, as in this guide. It also does not make anything unlawful lawful: an HDB owner must still follow HDB's rental rules, covered in the subletting rules page. And it does not replace a deposit clause, which says what can be deducted at the end, see the deposit guide.

If you and the other party cannot agree, CEA says it cannot act on disputes that do not involve a property agency or a property agent, and suggests mediation at a Community Mediation Centre, the Small Claims Tribunal, or your own legal action. That is another reason to settle the clause before you sign.

Frequently asked questions

Who pays for minor repairs in a Singapore tenancy?

Under the CEA tenancy agreement templates, the tenant pays minor repairs up to an amount per item per incident that the parties fill in, and the landlord pays the balance above it. The templates are a guide, not compulsory, so your own agreement governs.

What is the problem free period in a tenancy agreement?

It is a number of days, left blank in the CEA templates, from the start of the tenancy. Within it, the landlord does not hold the tenant responsible for defects the tenant reports in writing, and the landlord rectifies them.

Is there an official dollar limit for a minor repair?

I found no official figure. The CEA templates leave the amount blank for the landlord and tenant to agree, so it varies by agreement.

Who pays when an appliance cannot be repaired?

Under the CEA templates, if an item is faulty and beyond repair, the landlord bears the full cost of replacing it, provided the fault is not due to the tenant's negligence or wilful default.

Want your tenancy repair clause set up properly?

Share your property type and who supplies the appliances, and Winfred will go through the repair cap, problem free period and handover documents with you before you sign. General information only.

Ask Winfred on WhatsApp Book a free 30 minute call

Winfred Quek, CEA R073319H, Crestbrick Pte Ltd (L3010886H). General information as at 26 October 2026, not legal, financial, tax or property advice. Clause descriptions come from the CEA templates as at 26 October 2026, which are a guide and not compulsory. Case amounts in the example are assumed. This page makes no price or rent forecast.

Sources & References